Texas Eastern Transmission, L P
Seventh Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 11/16/2009, Docket: RP10-623-000, Status: Effective
First Rev Sixth Revised Sheet No. 532 First Rev Sixth Revised Sheet No. 532
Superseding: Sub Fifth Revised Sheet No. 532
GENERAL TERMS AND CONDITIONS
(Continued)
(D) Notice Required by Customer and Pipeline:
(1) Customer's Notice
A firm Customer that wants to release any or all of its capacity must
notify Pipeline via the LINK® System or, where applicable, by electronic
data interchange pursuant to the timelines specified in Section 3.14(B)
herein. Customer may elect not to reveal minimum conditions to anyone
other than Pipeline. Such Customer's Notice shall provide the terms and
conditions of the release as follows:
(a) on a permanent or temporary basis,
(b) on a recallable or non-recallable basis; and if recallable, (i)
whether the recall rights are on a full Day or a partial Day basis,
(ii) whether the Releasing Customer's recall notification must be
provided exclusively on a Business Day, and (iii) any reput methods
and rights associated with returning the previously recalled
capacity to the Replacement Customer. These rights and methods may
be either: (i) reput must be accepted by the original Replacement
Customer for the original terms of the release, or (ii) reput may be
accepted at the option of the original Replacement Customer for the
original terms of the release.
(c) the Business Day the Bid Period will expire if the Customer desires
to establish a Bid Period that is longer than Pipeline's default as
outlined in Section 3.14(B) herein. The Customer will not be able
to specify an extension of the original Bid Period or the
prearranged deal Match Period without posting a new release.
(d) the specific description including a numeric quantity of the
capacity rights to be released at a specific location (e.g. station
to station, meter to meter, by Zone or by portion thereof, or
multiple Zone, single transaction). The basis for the released
quantity shall be per Day for transportation, storage injection,
storage withdrawal, and a per-release quantity for storage capacity
and total release period quantity, subject to the limitations
described in Section 3.14(D)(3) below.
(e) the Releasing Customer's service agreement number,
(f) the period of time or term, including any objective, not unduly
discriminatory right of recall,
(g) any Prearranged Customer proposed to obtain released capacity under
the rates, terms and conditions contained in the Customer's Notice,
and whether such Prearranged Customer is affiliated with the
Releasing Customer,
(h) the minimum Reservation Charge, if any, or, if the Customer elects,
the minimum Reservation Charge restated on a volumetric basis, or on
a percentage basis of the maximum rate, or for a release on a
volumetric basis the volumetric commitments, and/or any other
minimum conditions. The Customer must state any rates equal to the
number of decimal places in the stated rates per Pipeline's Rate
Schedule. For releases that become effective on or after July 30,
2008, the Releasing Customer may specify a minimum Reservation
Charge requirement which is in excess of the maximum tariff rate for
the applicable service if (i) the term of the proposed release is
one (1) year or less, and (ii) the effective date of the proposed
release is on or before one (1) year from the date on which Pipeline
is notified of the release.