Texas Eastern Transmission, L P

Seventh Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 11/16/2009, Docket: RP10-623-000, Status: Effective

First Rev Sixth Revised Sheet No. 532 First Rev Sixth Revised Sheet No. 532

Superseding: Sub Fifth Revised Sheet No. 532

 

GENERAL TERMS AND CONDITIONS

(Continued)

 

(D) Notice Required by Customer and Pipeline:

 

(1) Customer's Notice

 

A firm Customer that wants to release any or all of its capacity must

notify Pipeline via the LINK® System or, where applicable, by electronic

data interchange pursuant to the timelines specified in Section 3.14(B)

herein. Customer may elect not to reveal minimum conditions to anyone

other than Pipeline. Such Customer's Notice shall provide the terms and

conditions of the release as follows:

 

(a) on a permanent or temporary basis,

(b) on a recallable or non-recallable basis; and if recallable, (i)

whether the recall rights are on a full Day or a partial Day basis,

(ii) whether the Releasing Customer's recall notification must be

provided exclusively on a Business Day, and (iii) any reput methods

and rights associated with returning the previously recalled

capacity to the Replacement Customer. These rights and methods may

be either: (i) reput must be accepted by the original Replacement

Customer for the original terms of the release, or (ii) reput may be

accepted at the option of the original Replacement Customer for the

original terms of the release.

(c) the Business Day the Bid Period will expire if the Customer desires

to establish a Bid Period that is longer than Pipeline's default as

outlined in Section 3.14(B) herein. The Customer will not be able

to specify an extension of the original Bid Period or the

prearranged deal Match Period without posting a new release.

(d) the specific description including a numeric quantity of the

capacity rights to be released at a specific location (e.g. station

to station, meter to meter, by Zone or by portion thereof, or

multiple Zone, single transaction). The basis for the released

quantity shall be per Day for transportation, storage injection,

storage withdrawal, and a per-release quantity for storage capacity

and total release period quantity, subject to the limitations

described in Section 3.14(D)(3) below.

(e) the Releasing Customer's service agreement number,

(f) the period of time or term, including any objective, not unduly

discriminatory right of recall,

(g) any Prearranged Customer proposed to obtain released capacity under

the rates, terms and conditions contained in the Customer's Notice,

and whether such Prearranged Customer is affiliated with the

Releasing Customer,

(h) the minimum Reservation Charge, if any, or, if the Customer elects,

the minimum Reservation Charge restated on a volumetric basis, or on

a percentage basis of the maximum rate, or for a release on a

volumetric basis the volumetric commitments, and/or any other

minimum conditions. The Customer must state any rates equal to the

number of decimal places in the stated rates per Pipeline's Rate

Schedule. For releases that become effective on or after July 30,

2008, the Releasing Customer may specify a minimum Reservation

Charge requirement which is in excess of the maximum tariff rate for

the applicable service if (i) the term of the proposed release is

one (1) year or less, and (ii) the effective date of the proposed

release is on or before one (1) year from the date on which Pipeline

is notified of the release.