Texas Eastern Transmission, L P
Seventh Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 11/16/2009, Docket: RP10-53-000, Status: Effective
First Revised Sheet No. 438 First Revised Sheet No. 438
Superseding: Original Sheet No. 438
RATE SCHEDULE FTS-8
(Continued)
3.5 Pipeline shall not be obligated to adjust the Reservation Charge pursuant to Section
3.4 when Pipeline's failure to deliver on any one Day at least 95% of the Quantity of
Gas requested by Customer to be delivered at Point(s) of Delivery which Gas Pipeline is
obligated to deliver on a firm basis at such Point(s) of Delivery on such Day up to the
MDQ:
(A) is the result of the conduct of Customer or the downstream operator of the
facilities at the Point of Delivery;
(B) is the result of Pipeline having operational flow orders in effect on such Day;
(C) is the result, during the period from May 1 through November 1 of any year, of
Pipeline performing routine operational maintenance and repair;
(D) is the result of Pipeline performing at anytime repair and maintenance of its
facilities to comply with applicable regulatory requirements, or