Texas Eastern Transmission, L P
Seventh Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 11/16/2009, Docket: RP10-53-000, Status: Effective
Second Revised Sheet No. 349 Second Revised Sheet No. 349
Superseding: Sub First Revised Sheet No. 349
RATE SCHEDULE MBA
(Continued)
(A) MBA Party will have the right to minimize the imbalance level until the close of
the seventeenth Business Day after the end of the Month during which the
imbalances occurred, pursuant to Sections 2.2(A) through 2.2(E) herein and
Section 8.3 of the General Terms and Conditions; provided that minimization does
not require transportation through a Posted Point of Restriction on Pipeline's
system for that Month.
(B) Any imbalance remaining after the operation of this Section 2 will be resolved in
accordance with Section 8 of the General Terms and Conditions.
3. GENERAL TERMS AND CONDITIONS
All of the General Terms and Conditions of Pipeline's FERC Gas Tariff of which this Rate
Schedule is a part are applicable to this Rate Schedule and are made a part hereof to the
extent that such terms and conditions are not contradicted by any provision herein. For
purposes of the applicable General Terms and Conditions of Pipeline's FERC Gas Tariff,
references to Customer shall refer to the MBA Party.