Texas Eastern Transmission, L P

Seventh Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 11/16/2009, Docket: RP10-53-000, Status: Effective

First Revised Sheet No. 336 First Revised Sheet No. 336

Superseding: Original Sheet No. 336

 

RATE SCHEDULE TABS-2

 

TRANSPORTATION AGGREGATION BALANCING SERVICE

 

1. AVAILABILITY

 

This Open-access Rate Schedule is available to any party (hereinafter called the TABS-2

Party) which has requested transportation aggregation balancing service pursuant to Section 3

of Texas Eastern Transmission, LP's (hereinafter called Pipeline) General Terms and

Conditions and, after review and acceptance of such request by Pipeline, has entered into a

service agreement with Pipeline for service under Rate Schedule TABS-2. Such service

agreement shall be in the form contained in Pipeline's FERC Gas Tariff of which this Rate

Schedule TABS-2 is a part.

 

2. APPLICABILITY AND CHARACTER OF SERVICE

 

This Rate Schedule TABS-2 shall permit a TABS-2 Party to pre-inject Gas and/or alter receipts

into Pipeline's system for the purpose of assisting Pipeline in attempting to avoid

operational emergencies and/or the necessity for issuing operational flow orders, as more

fully set forth in Section 3 herein, or, with Pipeline's consent, for the purpose of pre-

injecting Gas into Pipeline's system in anticipation by TABS-2 Parties of increased Gas

demand requirements as more fully set forth in Section 4 herein, or when necessary to

alleviate Gas supply shortages, as set forth in Section 5 herein. The pre-injection of Gas

can be accomplished by either (1) Pipeline's receipt of Gas physically injected into its

system at Point(s) of Receipt or (2) Pipeline's retention, by displacement, of Gas otherwise

scheduled for delivery out of its system at Point(s) of Delivery. Gas retained by

displacement shall be deemed delivered under the applicable rate schedule and the applicable

charges shall be paid by Customer to Pipeline.

 

3. PIPELINE OPERATIONAL REQUIREMENTS

 

3.1 In the event Pipeline is willing to allow pre-injection of Gas into its system by TABS-

2 Parties for the reasons set forth in Section 2 of this Rate Schedule TABS-2, Pipeline

shall post on the LINK® System: (a) the Quantity of Gas requested; (b) the TABS Service

Point(s) at which such Quantity of Gas is required; (c) the period of time during which

conforming offers will be accepted from TABS-2 Parties; and (d) whether TABS-2 Parties

must leave pre-injected Gas in Pipeline's system until further notice from Pipeline.

Any pre-qualified TABS-2 Party may inform Pipeline during the time period specified in

the posting of its desire to inject Gas into Pipeline's system. Pipeline shall accept

Gas from TABS-2 Parties offered in conformance with the request posted by Pipeline on a

first-come, first served basis.