1. AVAILABILITY
This Open-access Rate Schedule is available to any party (hereinafter called the TABS-2
Party) which has requested transportation aggregation balancing service pursuant to Section 3
of Texas Eastern Transmission, LP's (hereinafter called Pipeline) General Terms and
Conditions and, after review and acceptance of such request by Pipeline, has entered into a
service agreement with Pipeline for service under Rate Schedule TABS-2. Such service
agreement shall be in the form contained in Pipeline's FERC Gas Tariff of which this Rate
Schedule TABS-2 is a part.
2. APPLICABILITY AND CHARACTER OF SERVICE
This Rate Schedule TABS-2 shall permit a TABS-2 Party to pre-inject Gas and/or alter receipts
into Pipeline's system for the purpose of assisting Pipeline in attempting to avoid
operational emergencies and/or the necessity for issuing operational flow orders, as more
fully set forth in Section 3 herein, or, with Pipeline's consent, for the purpose of pre-
injecting Gas into Pipeline's system in anticipation by TABS-2 Parties of increased Gas
demand requirements as more fully set forth in Section 4 herein, or when necessary to
alleviate Gas supply shortages, as set forth in Section 5 herein. The pre-injection of Gas
can be accomplished by either (1) Pipeline's receipt of Gas physically injected into its
system at Point(s) of Receipt or (2) Pipeline's retention, by displacement, of Gas otherwise
scheduled for delivery out of its system at Point(s) of Delivery. Gas retained by
displacement shall be deemed delivered under the applicable rate schedule and the applicable
charges shall be paid by Customer to Pipeline.
3. PIPELINE OPERATIONAL REQUIREMENTS
3.1 In the event Pipeline is willing to allow pre-injection of Gas into its system by TABS-
2 Parties for the reasons set forth in Section 2 of this Rate Schedule TABS-2, Pipeline
shall post on the LINK® System: (a) the Quantity of Gas requested; (b) the TABS Service
Point(s) at which such Quantity of Gas is required; (c) the period of time during which
conforming offers will be accepted from TABS-2 Parties; and (d) whether TABS-2 Parties
must leave pre-injected Gas in Pipeline's system until further notice from Pipeline.
Any pre-qualified TABS-2 Party may inform Pipeline during the time period specified in
the posting of its desire to inject Gas into Pipeline's system. Pipeline shall accept
Gas from TABS-2 Parties offered in conformance with the request posted by Pipeline on a
first-come, first served basis.