Texas Eastern Transmission, L P
Seventh Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 03/14/2010, Docket: RP10-375-000, Status: Effective
Fourth Revised Sheet No. 284 Fourth Revised Sheet No. 284
Superseding: Third Revised Sheet No. 284
RATE SCHEDULE LLFT
(Continued)
(C) is the result, during the period from May 1 through November 1 of any year, of
Pipeline performing routine operational maintenance and repair;
(D) is the result of Pipeline performing at anytime repair and maintenance of its
facilities to comply with applicable regulatory requirements, or
(E) occurs either (1) within ten (10) Days following a force majeure event as
contemplated by Section 17.1 of the General Terms and Conditions, or (2) prior to
the date Pipeline has or should have, in the exercise of due diligence, overcome
the force majeure event, whichever occurs first.
provided, however, 3.5(C) and 3.5(D) are also subject to the notice and due diligence
requirements of Section 17.3 of the General Terms and Conditions.
3.6 Customized Reservation Pattern™ (CRP™)
(A) The CRP™ election provides an alternative to uniform monthly billing of the
Reservation Charge as contemplated by the rates set forth on the Statement of
Rates for Rate Schedule LLFT. Billing and payment of CRP™ Reservation Charges
shall be in accordance with the reservation pattern elected by Customer on the
LINK® System. Rates reflecting such Customer election shall be posted on the
LINK® System. The total Reservation Charges resulting from CRP™ will not exceed
the total Reservation Charges Customer would pay without the CRP™ election for
the same 12 Month period. An adjustment, if necessary, will be included on the
invoice for the last Month of the CRP™ period (November 1 - October 31) to ensure
Reservation Charges due Pipeline under Pipeline's uniform effective rates equal
the Reservation Charges received by Pipeline under the CRP™ rates. All rights
and obligations of Section 10 of the General Terms and Conditions shall apply to
the Reservation Charge for each billing Month as elected by Customer. In the
event any CRP™ invoice shall be based on rates in effect subject to refund and
refunds shall be required, refunds shall be calculated as if the CRP™ election
had not been made.
(B) Customer who is the primary capacity holder paying maximum reservation rates and
has contracted for capacity for the full CRP™ period may elect flexible maximum
reservation rates under CRP™ that are derived from the maximum uniform rates for
service on the effective Statement of Rates for Rate Schedule LLFT. Customer
shall submit to Pipeline by September 1 on an annual basis via the LINK® System
its election to participate in the CRP™ program. Customers electing CRP™ will be
allowed to spread Reservation Charges excluding cost components subject to
adjustment pursuant to trackers due for the period April through October over the
preceding November through March period. Customers with seasonal