Texas Eastern Transmission, L P
Seventh Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 02/01/2010, Docket: RP10-278-000, Status: Effective
Nineteenth Revised Sheet No. 51B Nineteenth Revised Sheet No. 51B
Superseding: Eighteenth Revised Sheet No. 51B
CURRENTLY EFFECTIVE SERVICE RATES APPLICABLE TO OPEN ACCESS, PART 284, RATE
SCHEDULES IN FERC GAS TARIFF, SEVENTH REVISED VOLUME NO. 1
MLS-1 CHARGES
MARKET LATERAL FACILITY CHARGES $/dth
Maximum Minimum
Docket No. CP02-17-000 (Freehold Lateral):
Rates Pursuant to Section 3.2 of Rate Schedule MLS-1:
RESERVATION CHARGE 0.6315 0.0000
USAGE-2 CHARGE 0.0208
RESERVATION CHARGE ADJUSTMENT 0.0208 0.0000
Rates Pursuant to Section 3.14 of the General Terms and Conditions:
VOLUMETRIC RESERVATION CHARGE 0.0208 0.0000
BASE UNIT ELECTRIC POWER COST $0.0422
ELECTRIC POWER COST ADJUSTMENT -0.0265
ADJUSTED ELECTRIC POWER COST $0.0157
APPLICABLE SHRINKAGE PERCENTAGE
December 1 through November 30: 0.01 %
Docket No. CP02-45-000 (Hanging Rock Lateral):
Rates Pursuant to Section 3.2 of Rate Schedule MLS-1:
RESERVATION CHARGE 1.112 0.0000
USAGE-2 CHARGE 0.0366
RESERVATION CHARGE ADJUSTMENT 0.0366 0.0000
Rates Pursuant to Section 3.3 of Rate Schedule MLS-1:
USAGE-1 0.0366
USAGE-2 0.0366
Rates Pursuant to Section 3.14 of the General Terms and Conditions:
VOLUMETRIC RESERVATION CHARGE 0.0366 0.0000
APPLICABLE SHRINKAGE PERCENTAGE
December 1 through November 30: 0.01 %