Southern LNG Inc.

Original Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 12/01/2001, Docket: CP99-582-004, Status: Effective

Original Sheet No. 53 Original Sheet No. 53 : Effective

 

GENERAL TERMS AND CONDITIONS

(Continued)

 

5.4 Prior Period Adjustments:

 

The deadline for closing measurement data shall be no later than 5 business days after the

month of flow. Any measurement data or corrections received by Southern LNG (including

corrections to allocations) after it has closed the previous month of flow shall be handled as

a prior period adjustment. Southern LNG shall process late measurement data or corrections of

measurement errors under Section 5.3 as soon as practicable but no later than 6 months after

the applicable month of flow in question. The correction shall be made to the month of flow

for allocation and billing purposes. If Customer disputes the measurement adjustment, then it

will have 3 months after the prior period adjustment is made to provide information that rebuts

the adjustment. Excluding government-required rate changes and as otherwise provided herein, no

prior period adjustments of any kind shall be made after 6 months following the invoiced month

for transportation, storage or pooling services. These deadlines do not apply in the case of

deliberate omission or misrepresentation or mutual mistake of fact. The parties' other

statutory or contractual rights shall not be diminished by this provision.

 

6. RECEIPT AND DELIVERY POINTS

 

6.1 Receipt Point:

 

The Receipt Point for all LNG unloaded from Customer's vessel(s) shall be at the point, whether

one or more, at which the flange at the outlet of the unloading piping of Customer's vessel

joins the flange at the entry of the receiving LNG pipeline at Southern LNG's marine terminal.

Southern LNG receives natural gas only in a liquefied state.

 

6.2 Delivery Point:

 

The Delivery Point for all vaporized LNG delivered by Southern LNG to Customer shall be an

interconnect between the Terminal and a downstream pipeline.