Southern LNG Inc.
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 12/01/2001, Docket: CP99-582-004, Status: Effective
Original Sheet No. 47 Original Sheet No. 47 : Effective
GENERAL TERMS AND CONDITIONS
(Continued)
(i) Gauging equipment:
(1) Customer shall cause to be supplied, operated, and maintained equipment for
accurately gauging the level of liquid and liquid temperature in the tanks of
Customer's vessel(s). Southern LNG shall supply, operate and maintain all
equipment, instruments, and devices used for the sampling of and for the
density, quality, and composition of the LNG unloaded.
(2) All measurements and calculations relating to gauging and determination of
the density of the LNG and the testing of the quality and composition of the
LNG shall be performed by Southern LNG. Representatives of Customer shall
have the right to be present, but the absence of a representative shall not
prohibit any measurement, calculations, or testing.
(3) Both parties shall have the right to inspect at all times and be present at
the calibration of the measuring and testing equipment upon reasonable
notice. All testing data, charts, calculations or any other similar
information shall be made available to the parties and preserved for a period
of not less than three years.
(j) Verification of accuracy:
(1) The accuracy of the instruments used shall be verified at the request of
either Southern LNG or Customer. Such verifications shall be made in the
presence of the Party requesting verification, in accordance with methods
recommended by the manufacturers of the measuring instruments.