Phillips Gas Pipeline Company
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 06/01/1993, Docket: RS92- 47-003, Status: Effective
Original Sheet 60A Original Sheet 60A : Effective
(b) PGPL shall within one (1) business day, post notice
of such Releasing Shipper's available capacity on its
EBB. Such notice shall include all information
delineated in Section 21.4(a), herein above.
Additionally, PGPL shall include in the notice: (1)
the maximum reservation rate (including any
demand-type surcharges) applicable to the capacity
being released; (2) the date and time the bid period
ends; and (3) the date and time the notice is posted
on the EBB. PGPL's EBB also provides for direct
posting by: (i) a Releasing shipper desiring to
release all or a portion of its available capacity; or
(ii) a Potential Replacement Shipper. Bids may
then be submitted to PGPL by Potential
Replacement Shippers at any time during the open
season described herein below, via PGPL's EBB.
Should a Potential Replacement Shipper be unable
or otherwise choose not to utilize the EBB, it may
alternatively conduct any and all business
delineated in this Section 21.4(b) by contacting
D. C. Harban via telephone (713-669-2930), fax
(713-669-3402) or as provided in Section 17.1 of the
General Terms and Conditions contained within
this Tariff. Regardless of the method a Potential
Replacement Shipper chooses to notify PGPL, all
bids, including those made by mail, telephone or
fax will be promptly posted on the EBB. A
Potential Replacement Shipper may not bid more
than the maximum rate specified by this First
Revised Volume No. 1 Tariff; nor may the volume
or the terms of the release of such bid exceed the
maximum volume or term specified by the
Releasing Shipper. A Releasing Shipper may not
rollover or extend a release of less than one (1)
calendar month without first posting such extension
on the EBB for competitive bidding. Also, the
Releasing Shipper may not enter into a new short-
term release with the same Potential Replacement
Shipper until at least thirty (30) days after the first
release. The term of any open season