however, that PGPL may require at its option that Shipper bear
the expense of furnishing and installing such equipment, devices
and materials. Shipper may install and operate check
measuring equipment provided it does not interfere with the
use of PGPL's equipment.
3.2 Testing Meter Equipment: PGPL's meter or meters shall be
open to inspection by Shipper in the presence of PGPL. PGPL
shall test its meters for accuracy of measurement quarterly or
as often as PGPL deems advisable. Notice of the time and
nature of each test shall be given by PGPL to Shipper
sufficiently in advance to permit convenient arrangement for
the presence of the representative of Shipper. If after notice
Shipper fails to have a representative present, the results of the
test shall nevertheless be considered accurate until the next
test. If any of the measuring equipment is found to be
registering inaccurately in any percentage, it shall be adjusted
at once to read as accurately as possible. A registration within
one percent (1%) of correct shall be considered correct as to
deliveries prior to the test.
3.3 Correction and Adjustment: If upon test, measuring equipment
is found to be not more than one percent (1%) inaccurate,
previous readings of such equipment after the last preceding
test shall be considered correct, but equipment shall be
adjusted to record accurately. If, on any test, measuring
equipment is found to be inaccurate by an amount exceeding
one percent (1%), or if at any time measuring equipment
should be out of service or not registering, gas delivered
through the period during which the measuring equipment was
registering inaccurately or was out of service or not registering
shall be estimated upon by use of the first of the following
methods which may be applicable:
(a) By using the registration of any check measuring
equipment installed by Shipper if registering accurately;
or