Phillips Gas Pipeline Company
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 06/01/1993, Docket: RS92- 47-003, Status: Effective
Original Sheet No. 32 Original Sheet No. 32 : Effective
2.2 Composition and Heating Value Determination:
(a) The quarterly specifications of the gas received
hereunder shall be determined by tests which PGPL
shall cause to be made at each receiving point and
further as agreed by PGPL and Shipper.
(b) Quarterly, or as often as PGPL deems advisable, PGPL
shall cause to be obtained a representative sample of
Shipper's gas at each point of receipt and delivery and
by means of chromatography or other accepted method
in the industry determine the composition and gross
heating value of Shipper's gas in British Thermal Units
(Btu) per cubic foot on a dry basis. The first such
determination shall be made within a reasonable time
after receipt of gas begins and shall apply until the first
day of the month following the next determination.
PGPL shall notify Shipper in writing of the date of the
test at least ten (10) days prior thereto. Shipper may
witness the tests or make joint tests with its own
appliances.
(c) Shipper and PGPL shall each have the right to require
the other to remedy any deficiency in quality of the gas
received or delivered hereunder, and in the event such
deficiency is not remedied, either party shall have the
right, in addition to all other remedies available to it by
law, to refuse to accept such deficient gas until such
deficiency is remedied; however, PGPL shall be under
no obligation to deliver any quality of gas exceeding
merchantable quality.
3. MEASURING EQUIPMENT
3.1 Installation: At each point of receipt and delivery hereunder
all measuring equipment, devices and materials shall be
furnished and installed, owned, maintained and operated by
PGPL except as provided in Section 4.1 below; provided