Pine Needle LNG Company, LLC
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 05/01/1999, Docket: CP96- 52-003, Status: Effective
Original Sheet No. 65 Original Sheet No. 65 : Effective
GENERAL TERMS AND CONDITIONS
(Continued)
18. FUEL RETENTION ADJUSTMENT PROVISION (Continued)
18.6 GRO Index
For any month, the GRO Index shall consist of the simple average of
four relevant price series, expressed in units of $/MMBTU, set forth
in the table "Gas Price Report" published in the first issue in such
month of Natural Gas Week (or any succeeding publication of Oil Daily,
Inc.) for the following geographical regions:
Texas, Gulf Coast, Offshore, Spot Delivered to
Pipeline
Texas, Gulf Coast, Onshore, Spot Delivered to
Pipeline
Louisiana, Gulf Coast, Offshore, Spot Delivered
to Pipeline
Louisiana, Gulf Coast, Onshore, Spot Delivered
to Pipeline
19. ELECTRIC POWER COST ADJUSTMENT PROVISION
19.1 General
This section of the General Terms and Conditions sets forth the
procedures to reflect in Pine Needle's rates changes in the amounts
payable by Pine Needle for electric power costs used at Pine Needle's
LNG plant.
19.2 Conditions
(a) The Electric Power Cost rate set forth on Sheet No. 4 of
this tariff may be increased to reflect a net positive
change in Electric Power rates and shall be decreased to
reflect a net negative change in Electric Power rates.
(b) Pine Needle shall file with the FERC to reflect net changes
in the Electric Power rates at least 30 days prior to each
May 1, which is the beginning date for the Electric Power
Annual Period.