Portland General Electric Company
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 12/03/2003, Docket: RP04- 48-000, Status: Effective
Original Sheet No. 108 Original Sheet No. 108 : Effective
GENERAL TERMS AND CONDITIONS
(Continued)
20. CAPACITY RELEASE (Continued)
6. identify (if applicable) any affiliate of Transporter
involved in the transaction.
Releasing Shipper and Prearranged Replacement Shipper must comply
with Sections 20.2(j), (k) and (p) herein. Transporter shall only be
obligated to accept nominations pursuant to the service contemplated by
this Section 20.3(a) after Releasing Shipper has submitted to Transporter
and Transporter has posted the release to the EBB and/or Designated Site.
(b) For a release involving a Prearranged Replacement Shipper where
the rate is equal to the maximum base rate and the term is one (1) year
or longer, the Prearranged Replacement Shipper shall be awarded the
released capacity without the necessity of waiting for competing bids to
be submitted. However, Transporter shall be notified of the release by
the Releasing Shipper and the notification shall contain the same
information as identified in Section 20.3(a) above. Transporter shall
post a notice of the occurrence of the release on its EBB and/or
Designated Site.