Portland General Electric Company
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 12/03/2003, Docket: RP04- 48-000, Status: Effective
Original Sheet No. 78 Original Sheet No. 78 : Effective
GENERAL TERMS AND CONDITIONS
(Continued)
14. DETERMINATION OF DELIVERIES AND IMBALANCES (Continued)
(v) In addition to (iii) and (iv) above, for that part of
the unauthorized underrun imbalances not taken within the
72 hour period as set forth in Section 14.5(c), an amount
equal to two times the Index Price per Dth.
(e) Waiver. Transporter will waive all or a portion of the
daily unauthorized overrun and underrun charges provided in
Section 14.5(c) when Transporter fails to make Scheduled
Quantities available to point operators and Shippers, including
bumped parties, at the times specified in Section 13.1(a) for any
of the Nomination Cycles, provided that:
(i) Transporter was solely at fault for the failure to
make the Scheduled Quantities available; and
(ii) the affected party demonstrates that the failure to
provide Scheduled Quantities on a timely basis materially
impacted such party's ability to stay within its
Declared Entitlement levels.
The waiver will not apply (1) to gas that flowed more than one
hour after the start of the Gas Day if Scheduled Quantities are
made available prior to the start of the Gas Day or (2) to gas
that flowed more than one hour after Scheduled Quantities were
made available for nominations submitted during the Intraday 1 or
Intraday 2 Nomination Cycles.