Portland General Electric Company
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 12/03/2003, Docket: RP04- 48-000, Status: Effective
Original Sheet No. 58 Original Sheet No. 58 : Effective
GENERAL TERMS AND CONDITIONS
(Continued)
13. OPERATING CONDITIONS (Continued)
Nominations received after nomination deadline
shall be scheduled after the nominations received before
the nomination deadline. (NAESB 1.3.6)
All nominations shall be considered original
nominations and shall be replaced to be changed. When a
nomination for a date range is received, each day within
that range is considered an original nomination. When a
subsequent nomination is received for one or more days
within that range, the previous nomination is superseded by
the subsequent nomination only to the extent of the days
specified. The days of the previous nomination outside the
range of the subsequent nomination are unaffected.
Nominations have a prospective effect only. (NAESB 1.3.7)
Intra-day nominations can be used to request
increases or decreases in total flow, changes to receipt
points, or changes to Delivery Points of scheduled gas.
(NAESB 1.3.11)
Intra-day nominations do not rollover (i.e.,
intra-day nominations span one day only). Intra-day
nominations do not replace the remainder of a standing
nomination. There is no need to re-nominate if intra-day
nomination modifies existing nomination. (NAESB 1.3.13)