Portland General Electric Company
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 12/03/2003, Docket: RP04- 48-000, Status: Effective
Original Sheet No. 55 Original Sheet No. 55 : Effective
GENERAL TERMS AND CONDITIONS
(Continued)
13. OPERATING CONDITIONS (Continued)
(iv) The Intraday 2 Nomination Cycle: 5:00 pm for nominations
leaving control of the nominating party; 5:15 pm for receipt
of nominations by the transporter (including TTTSPs); 5:30 pm
to send Quick Response; 8:00 pm for receipt of completed
confirmations by transporter from upstream and downstream
connected parties; 9:00 pm for Transportation Service Provider
to provide scheduled quantities to affected shippers and point
operators (central clock time on the gas day). Scheduled
quantities resulting from Intraday 2 Nominations should be
effective at 9:00 pm on gas day. Bumping is not allowed
during the Intraday 2 Nomination Cycle.
(v) For purposes of NAESB Standard 1.3.2 ii, iii, and iv, "provide"
shall mean, for transmittals pursuant to standards 1.4.x,
receipt at the Designated Site, and for purposes of other forms
of transmittal, it shall mean send or post.
The following timelines in Central Clock Time (with Pacific Clock
Times in parentheses) reflect NAESB Standard 1.3.2:
Timely Nomination Cycle (time on day prior to flow)
Nomination leaves control of
Nominating Party 11:30 (9:30) A.M.
Receipt of nomination by Transporter 11:45 (9:45) A.M.
Quick response by Transporter for
validity of data elements 12:00 Noon (10:00 A.M.)
Receipt of completed confirmations
by Transporter from upstream and
downstream connected parties 3:30 (1:30) P.M.
Scheduled quantities available to
Shippers and point operators 4:30 (2:30) P.M.
Scheduled quantities commence flow 9:00 (7:00) A.M.(gas day)