Portland General Electric Company

Original Volume No. 1

 Contents / Previous / Next / Main Tariff Index



Effective Date: 12/03/2003, Docket: RP04- 48-000, Status: Effective

Original Sheet No. 47 Original Sheet No. 47 : Effective








10.1 Tests and Repairs. Transporter shall have the right, without

liability to Shipper, to interrupt the transportation of gas for Shipper

when necessary to test, alter, modify, enlarge or repair any facility or

property comprising a part of, or appurtenant to, Transporter's pipeline

system, or otherwise related to the operation thereof. Transporter

shall endeavor to cause a minimum of inconvenience to Shipper because of

such interruptions.


10.2 Operational Control. Transporter shall retain full operational

control of its pipeline system and shall at all times be entitled to

schedule deliveries and to operate its pipeline system in a manner

which, in Transporter's sole opinion, is consistent with the obligations

and operating conditions as they may exist from time to time on

Transporter's system, or which will allow Transporter to optimize the

receipt and/or utilization of gas supplies on its transmission system

now and in the future. Nothing in any Service Agreement shall be deemed

to impinge on such operating flexibility.