Portland General Electric Company
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 12/03/2003, Docket: RP04- 48-004, Status: Effective
Second Revised Sheet No. 4 Second Revised Sheet No. 4 : Effective
Superseding: First Revised Sheet No. 4
STATEMENT OF TRANSPORTATION RATES
Effective Rates Applicable to Transportation Rate Schedules
Contained in this FERC Gas Tariff, Original Volume No. 1
The base tariff rates shown below, stated in dollars per Dth, are subject
to adjustment for FERC Annual Charges pursuant to Section 15 of the General
Terms and Conditions of this Tariff. The rates after adjustment are designated
"Currently Effective Tariff Rate".
Rate Schedule Base Tariff FERC
Rate Annual
Minimum Maximum Charges
______________ _______ _______ _______
$ $ $
FT-1 Reservation Charge 0.000 1.078
Commodity Charge*/ 0.000 0.000 0.0022
IT-1 0.000 0.035 0.0022
FT-1 Scheduled Overrun 0.000 0.035 0.0022
Transportation
IT-1 Scheduled Overrun 0.000 0.035 0.0022
Transportation
_____________________
*/ Portland General has no variable costs.