Wyoming Interstate Company, Ltd.

Second Revised Volume No. 2

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 04/12/2010, Docket: RP10-491-000, Status: Effective

Seventh Revised Sheet No. 64G Seventh Revised Sheet No. 64G

Superseding: Sixth Revised Sheet No. 64G

 

GENERAL TERMS AND CONDITIONS

(Continued)

 

9. CAPACITY RELEASE (Continued)

 

9.7 Capacity Release On An Open Season Basis. Any Shipper holding

capacity rights subject to this Section 9 who desires to release

such firm capacity on an Open Season Basis shall deliver notice via

Transporter's electronic bulletin board which shall contain the

following:

 

(a) Releasing Shipper's legal name, contract number, and the name

of the individual responsible for authorizing the release of

capacity;

 

(b) pursuant to GISB Standard 5.3.29, the basis for released

quantity should be per day for transportation, storage

injection, storage withdrawal, and a per-release quantity for

storage capacity and total release period quantity.

Accordingly, the Releasing Shipper's notice must include the

maximum and minimum quantity of firm daily capacity which the

Releasing Shipper desires to release, stated in Dth per Day;

 

(c) the Primary Point(s) of Receipt and Delivery at which the

Releasing Shipper will release capacity and the firm capacity

to be released at each such point;

 

 

(d) whether capacity will be released on a recallable or a

recallable and reputtable (returned to the Replacement

Shipper) basis (subject to minimum terms and conditions in

Section 9.12). Recall and reput terms must be objectively

stated, nondiscriminatory, and applicable to all bidders. A

Transportation Service Provider should support the ability

for the Releasing Shipper to specify, as a condition of a

release, whether the Releasing Shipper's recall notification

must be provided exclusively on a Business Day (NAESB WGQ

Standard 5.3.51).

 

(e) the requested effective date and the term of the release

(minimum term of release is one Day);

 

(f) whether the Releasing Shipper is willing to consider release

for a shorter time period than that specified in (e) above,

and, if so, the minimum acceptable period of release;