Wyoming Interstate Company, Ltd.

Second Revised Volume No. 2

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 04/12/2010, Docket: RP10-491-000, Status: Effective

Sixth Revised Sheet No. 64F Sixth Revised Sheet No. 64F

Superseding: Fifth Revised Sheet No. 64F

 

GENERAL TERMS AND CONDITIONS

(Continued)

 

9. CAPACITY RELEASE (Continued)

 

9.6 Prearranged Releases. A Shipper electing to release capacity on the

basis of a prearranged release must post notice on Transporter's

electronic bulletin board pursuant to Section 9.8 herein.

 

(a) No open season is required for a prearranged release which

meets all of the terms of the release and is: (1) a release

for more than one Year at the maximum Reservation Rate under

the applicable Tariff rate schedule; (2) a release for any

period of thirty-one Days or less; (3) a release to an asset

manager as defined by FERC regulations at 18 C.F.R. 284.8; or

(4) a release to a marketer participating in a state-

regulated retail access program as defined by FERC

regulations at 18 C.F.R. 284.8. All other prearranged

releases shall be subject to an open season requirement

contained in Section 9.5 hereof.

 

(b) A Releasing Shipper may not rerelease capacity that is a

rollover or extension of a release of thirty-one Days or

less to the same Replacement Shipper until twenty-eight Days

after the first release period has ended. The 28-Day hiatus

does not apply to any re-release to the same Replacement

Shipper that is posted for bidding or that qualifies for any

of the other exemptions from bidding in this Section 9.6.

 

(c) A Shipper electing to release capacity on prearranged basis

not subject to an open season must post the notice of release

on Transporter's electronic bulletin board or submit its

notice via an EDI upload utilizing the data sets included in

the NAESB Standards pursuant to the timeline for non-biddable

releases in Sections 9.5 (b)(xii) - (xv).

 

(d) Any capacity release transactions effectuated during the

period between July 30, 2008 and November 21, 2008, shall be

grandfathered and shall not be required to comply with the

requirement of 18 C.F.R. 284.8(b)(2), that releases with a

rate greater than the maximum rate must take effect on or

before one year from the date on which the pipeline is

notified of the release.