Wyoming Interstate Company, Ltd.

Second Revised Volume No. 2

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 04/12/2010, Docket: RP10-491-000, Status: Effective

Third Revised Sheet No. 44 Third Revised Sheet No. 44

Superseding: Second Revised Sheet No. 44

 

GENERAL TERMS AND CONDITIONS

(Continued)

 

4. REQUESTS FOR SERVICES (Continued)

 

4.4 Capacity Reserved for Future Expansion/Extension Projects (Contd.)

 

(d) When reserving capacity for future expansion/extension

projects, Transporter shall first post all of its available

capacity for at least five business days prior to the

reservation period. Transporter shall post and award

available capacity in accordance with the service request

procedures of Section 4.1 of these General Terms and

Conditions.

 

(e) When the capacity to be reserved is offered through an open

season, Transporter shall have the right to impose minimum

terms and conditions for bids that would be acceptable. In

the event that the subsequent expansion project open season

imposes minimum terms and conditions that are materially

different from the terms and conditions imposed in the

previous capacity open season, Transporter shall hold another

open season for the reserved capacity that uses the same

minimum terms and conditions as were imposed for the

expansion project open season. If the expansion project open

season is held prior to or during the open season for the

reserved capacity, Transporter shall use the same minimum

terms and conditions as used for the expansion project open

season.

 

(f) Any capacity reserved under this Section 4.4 shall be made

available for transportation service pursuant to these

General Terms and Conditions on a limited-term basis up to

the in-service date of the expansion project(s). For such

limited-term FTSAs, Transporter reserves the right to limit

any term extension rights provided in the FTSA and pursuant

to Section 4.10 commensurate with the proposed in-service

date of the expansion project. Transporter will indicate in

any posting of the reserved capacity any limitations on term

extension rights that will apply to such limited-term

transportation service.

 

(g) Any capacity reserved for a project that does not go forward

for any reason shall be reposted as generally available

capacity within 30 days of the date that the project

terminates, with the exception of capacity committed to in

contracts entered into on an interim limited-term basis,

which shall be posted as available at the expiration of the

interim contracts.