Natural Gas Pipeline Company Of America

Second Revised Volume No. 2

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 10/02/2010, Docket: RP95- 24-005, Status: Effective

3rd Sub Sixteenth Revised Sheet No. 1412 3rd Sub Sixteenth Revised Sheet No. 1412 : Superseded

Superseding: Fifteenth Revised Sheet No. 1412

 

ARTICLE XII - TRANSPORTATION CHARGES*

 

 

12.1 NGPL TRANSPORTATION CHARGE.

 

(a) If Net Delivery Volumes are received by NGPL (excluding any volumes delivered by

CIG on NGPL's Gulf Coast System) and Redelivery Volumes are delivered by NGPL to CIG at one or more

Balancing Delivery Points listed in Exhibit "A" hereto, CIG shall pay NGPL monthly a transportation

charge in an amount equal to the product of (i) the Redelivery Volumes delivered by NGPL to CIG

hereunder during such month and (ii) a transportation rate per Mcf based on NGPL's currently

effective rates for the transportation service provided hereunder. The initial firm transportation

rates for NGPL's system shall be 15.19 cents per Mcf for the period November through March and 15.19

cents per Mcf for the period April through October. CIG shall pay NGPL monthly a transportation

charge in an amount equal to the product of (i) the Redelivery Volumes delivered by NGPL to CIG at

one or more Balancing Delivery Points listed in Exhibit "A" hereto as a result of Delivery Volumes

received by NGPL on its said onshore Gulf Coast System during such month and (ii) a transportation

rate per Mcf based on NGPL's currently effective rates for the transportation service provided

hereunder for transportation from NGPL's Gulf Coast System. No volumes will be transported by NGPL

under the terms of this Agreement through offshore facilities owned entirely or in part by NGPL.

 

(b) The transportation rate for any Redelivery Volumes transported by NGPL for CIG on

an interruptible basis shall be at the maximum rate for service under NGPL's IT Rate Schedule (or

any effective superseding rate schedule) on file with the FERC (as the same may change from time to

time).

 

 

12.2 CIG TRANSPORTATION CHARGES.

 

(a) The transportation rate for the Redelivery Volumes transported by CIG for NGPL on a

firm basis shall be designed on the same basis as CIG's rates under its Rate Schedule TF-1 (i.e., on

a demand/commodity basis) with a maximum total Delivery Volume of 6,000 Mcf per day and the rates

for such firm service shall be equal to the maximum reservation charge(s) and commodity charge(s)

permitted under CIG's Rate Schedule TF-1, as changed from time to time. In the event that CIG's

reservation charge is a two-part rate, NGPL shall provide CIG with a nominated annual volume.

 

 

12.3 CHANGES IN TRANSPORTATION CHARGES.

 

The parties recognize that the transportation rates provided in Sections 12.1 and 12.2

above may require change from time to time in order to reflect changes in related costs or changes

in methods of computation. The rates charged by NGPL and CIG pursuant to this Article XII may be

adjusted as required to reflect actual distances over which gas may be transported hereunder between

various

 

 

-----------------------

 

* Revised by amendments dated 8/18/81 and 11/1/91.