Natural Gas Pipeline Company Of America
Seventh Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 11/09/2009, Docket: RP09-855-002, Status: Effective
Substitute First Revised Sheet No. 606 Substitute First Revised Sheet No. 606
Superseding: Original Sheet No. 606
EXHIBIT C
DATED ............
EFFECTIVE ............
PRIMARY TRANSPORTATION PATH SEGMENT MDQs
----------------------------------------
Shipper: ............
Contract No.: ............
Pursuant to Natural's Tariff, an MDQ exists for each primary
transportation path segment and direction under the Agreement. Such MDQ
is the maximum daily quantity of gas which Natural is obligated to
transport on a firm basis along a primary transportation path segment.
A primary transportation path segment is the path between a primary
receipt, delivery or node point and the next primary receipt, delivery or
node point. A node point is the point of interconnection between two or
more of Natural's pipeline facilities.
A segment is a section of Natural's pipeline system designated by a
segment number whereby the Shipper under the terms of their agreement
based on the points within the segment identified on Exhibit C have
throughput capacity rights.
The segment numbers listed on Exhibit C reflect this Agreement's
path corresponding to Natural's most recent Pipeline System Map which
identifies segments and their corresponding numbers. All information
provided in this Exhibit C is subject to the actual terms and conditions
of Natural's Tariff.