Natural Gas Pipeline Company Of America

Seventh Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 04/18/2008, Docket: RP08-319-000, Status: Effective

Original Sheet No. 439 Original Sheet No. 439 : Pending

 

 

GENERAL TERMS AND CONDITIONS

----------------------------

 

necessary to uniquely identify the capacity being recalled. For

recalls that are effective at non-standard times, the appropriate

recall notification period is to be included in the subject line and

the effective time of the recall is to be in the body of the E-mail.

If Natural allows capacity recall notification mechanisms in addition

to Internet E-mail, the notification is to include at least the same

level of information. Affected Replacement Shippers are to manage

internal distribution of notifications of recall received from

Natural.

 

(2) The Releasing Shipper shall provide capacity

recall notification to Natural through Natural's Interactive Website.

The Releasing Shipper shall provide notice to its affected

Replacement Shipper at the same time it provides notification to

Natural. The recall notification must specify the recall

notification period for the specified effective gas Day, as well as

any other information needed to uniquely identify the capacity being

recalled. The mode of notification is to be mutually agreed upon

between the Releasing and the Replacement Shipper.

 

(3) All recalled capacity notices must indicate

whether penalties will apply for the gas day for which quantities are

reduced due to a capacity recall.

 

(d) QUANTITY ALLOCATION

 

In the event of an intra-day capacity recall,

Natural shall determine the allocation of capacity between the

Releasing Shipper and the Replacement Shipper(s) based upon the

Elapsed Prorata Capacity (EPC). In any recall notification provided

to Natural, the quantity should be expressed in terms of the adjusted

total released capacity entitlements based upon EPC. EPC means that

portion of the capacity that would have theoretically been available

for use prior to the effective time of the intraday recall based upon

a cumulative uniform hourly use of the capacity. The amount of the

capacity allocated to the Replacement Shippers(s) should equal the

original released capacity less the recalled capacity that is

adjusted based upon the EPC. Natural shall not be obligated to

deliver in excess of the total daily contract quantity of the release

as a result of any recall. The service flexibility available to

either the Releasing Shipper or the Replacement Shipper for the

subject capacity shall not be less as a result of the recall.