Natural Gas Pipeline Company Of America
Seventh Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 04/18/2008, Docket: RP08-319-000, Status: Effective
Original Sheet No. 439 Original Sheet No. 439 : Pending
GENERAL TERMS AND CONDITIONS
----------------------------
necessary to uniquely identify the capacity being recalled. For
recalls that are effective at non-standard times, the appropriate
recall notification period is to be included in the subject line and
the effective time of the recall is to be in the body of the E-mail.
If Natural allows capacity recall notification mechanisms in addition
to Internet E-mail, the notification is to include at least the same
level of information. Affected Replacement Shippers are to manage
internal distribution of notifications of recall received from
Natural.
(2) The Releasing Shipper shall provide capacity
recall notification to Natural through Natural's Interactive Website.
The Releasing Shipper shall provide notice to its affected
Replacement Shipper at the same time it provides notification to
Natural. The recall notification must specify the recall
notification period for the specified effective gas Day, as well as
any other information needed to uniquely identify the capacity being
recalled. The mode of notification is to be mutually agreed upon
between the Releasing and the Replacement Shipper.
(3) All recalled capacity notices must indicate
whether penalties will apply for the gas day for which quantities are
reduced due to a capacity recall.
(d) QUANTITY ALLOCATION
In the event of an intra-day capacity recall,
Natural shall determine the allocation of capacity between the
Releasing Shipper and the Replacement Shipper(s) based upon the
Elapsed Prorata Capacity (EPC). In any recall notification provided
to Natural, the quantity should be expressed in terms of the adjusted
total released capacity entitlements based upon EPC. EPC means that
portion of the capacity that would have theoretically been available
for use prior to the effective time of the intraday recall based upon
a cumulative uniform hourly use of the capacity. The amount of the
capacity allocated to the Replacement Shippers(s) should equal the
original released capacity less the recalled capacity that is
adjusted based upon the EPC. Natural shall not be obligated to
deliver in excess of the total daily contract quantity of the release
as a result of any recall. The service flexibility available to
either the Releasing Shipper or the Replacement Shipper for the
subject capacity shall not be less as a result of the recall.