Natural Gas Pipeline Company Of America
Seventh Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 04/18/2008, Docket: RP08-319-000, Status: Effective
Original Sheet No. 421 Original Sheet No. 421 : Pending
GENERAL TERMS AND CONDITIONS
----------------------------
(2) The fixed reservation charge and/or volumetric
charge the Prearranged Shipper has agreed to pay for the released
capacity;
(3) Whether the capacity being released is subject
to recall and/or reput in the Prearranged Release, and if so, the
exact conditions of such recall and/or reput (which conditions must
conform with Sections 19.5 and 19.14); and
(4) The proposed effective date of the Prearranged
Release and the proposed term of the Prearranged Release.
(c) Whether the Releasing Shipper will accept Qualified
Bids which are contingent on subsequent events (such as the
subsequent purchase of upstream or downstream capacity), and if so,
what events and the last date by which such contingency must be
fulfilled;
(d) Whether the Releasing Shipper will accept Qualified
Bids with longer terms or larger volumes, and if so, what is the
maximum volume and the longest term the Releasing Shipper will
accept;
(e) Whether the Releasing Shipper wants Natural to
actively market its capacity rights subject to the Prearranged
Release pursuant to Section 20 of these General Terms and
Conditions;
(f) The starting date for and the length of time for
the open season (which must conform to Section 19.7) and the length
of time (consistent with Section 19.9(b)) for the Prearranged
Shipper to be able to match a winning Qualified Bid;
(g) Whether the Releasing Shipper will accept Qualified
Bids whose revenues will vary by the volume transported, and if so,
any minimum amount to be billed as a reservation charge even if
there is no flow (or insufficient flow);
(h) Which of the bid evaluation procedures set forth in
Section 19.10 the Shipper wishes to use, if any;