Natural Gas Pipeline Company Of America
Seventh Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 04/18/2008, Docket: RP08-319-000, Status: Effective
Original Sheet No. 379 Original Sheet No. 379 : Pending
GENERAL TERMS AND CONDITIONS
----------------------------
Balancing Service Charges will be assessed for the variances that
are to the detriment of Natural's system, except as provided in
Section 12.6. Balancing Service Charges in effect during a
Critical Time will be as follows:
VARIANCE CHARGE
---------- ----------------------------------------
0% to 3% Greater of $4.00/Dth or 2 times AMIP
3% to 10% Greater of $12.00/Dth or 6 times AMIP
10% to 20% Greater of $40.00/Dth or 20 times AMIP
20% to 50% Greater of $80.00/Dth or 40 times AMIP
Above 50% Greater of $200.00/Dth or 100 times AMIP
(b) Shipper shall in addition pay all applicable
charges specified in Sections 12.2(a)(1) and 12.2(b). Charges
hereunder shall be in lieu of any otherwise applicable Balancing
Service Charges under Sections 12.2(a)(2) and 12.3, but the
charges identified in the prior sentence shall still apply.
(c) Any imbalance created during a Critical Time
that is not eliminated before the end of the month will be
subject to the cashout and offsetting provisions of Section 13;
provided, however, that any remaining imbalance created during a
Critical Time which helped the system will be cashed out at 100%
of the AMIP.
12.5 DECLARATION OF A CRITICAL TIME
(a) A Critical Time may be declared (1) when the
total physical receipts to all or a portion of the system are
approaching or expected to approach, a level that is in excess of
the total physical deliveries plus the maximum volumes of gas
Natural is able to inject into Natural's storage without
jeopardizing the integrity of Natural's storage facilities; (2)
when the total physical deliveries from all or a portion of the
system are approaching or expected to approach, a level that is
in excess of the total physical receipts and the maximum volume
of gas available to be withdrawn from Natural's storage without
jeopardizing the integrity of Natural's storage facilities; (3)
when system pressure on one or more pipeline segments is falling
and approaching a level or is expected to fall and approach a
level that is at or below the minimum that Natural considers
necessary for system integrity or to fulfill its firm contractual
obligations; (4) when system pressure on one or more pipeline