Natural Gas Pipeline Company Of America

Seventh Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 04/18/2008, Docket: RP08-319-000, Status: Effective

Original Sheet No. 359 Original Sheet No. 359 : Pending

 

 

GENERAL TERMS AND CONDITIONS

----------------------------

 

9. POOLING AND STORAGE POINTS

 

9.1 GENERAL

 

One or more paper pooling and storage points have been

designated for each receipt zone on Natural's system. These points

are not physical points on the system, but are used solely for

nomination and transportation rate determination purposes. Subject to

the remainder of this Section, any number and type of transportation

Agreements may be utilized to deliver gas to or from a storage or

pooling point.

 

9.2 POOLING POINTS

 

(a) There will be at least one pooling point in each

receipt zone. In Natural's Texok Receipt Zone, there shall be two

pooling points: one dedicated to volumes received on the A/G Line

(Station 801 and east to the interconnect between the Texok and Gulf

Coast Mainline Receipt Zones) and the Amarillo Line ("Texok A/G

Pooling Point"); and one dedicated to volumes received elsewhere in

the Texok Receipt Zone (from the Louisiana/Texas Border, including

contiguous offshore laterals, westward to Station 302 and then

northward to the Interconnect with the Gulf Coast Mainline Receipt

Zone) or anywhere else on the system other than the A/G Line and the

Amarillo Line ("Texok Gulf Coast Pooling Point"). In Natural's Iowa-

Illinois Receipt Zone there shall be two pooling points, one dedicated

to volumes received on the Amarillo Line ("Amarillo Pooling Point")

and one dedicated to volumes received on the Gulf Coast Line ("Gulf

Coast Pooling Point"). "Amarillo Line" shall be defined for purposes

of this Section 9 as all pipeline in the Permian, Midcontinent and

Amarillo Mainline Receipt Zones, and all pipeline west or north of

Station 113 in the Iowa-Illinois Receipt Zone. "Gulf Coast Line" shall

be defined for purposes of this Section 9 as all pipeline in the South

Texas, Texok, Louisiana and Gulf Coast Mainline Receipt Zones, and all

pipeline south of Station 113 (including Station 113) in the Iowa-

Illinois Receipt Zone. Notwithstanding the definition set out herein,

certain supply receipts on the Gulf Coast Line are treated as having

been received on the Amarillo Line, as set out in Section 5.6(c) of

these General Terms and Conditions, reflecting flow conditions on

Natural's system.

 

(b) Shippers will be able to nominate gas volumes from

one or more Receipt Points for delivery to a pooling point in order

to aggregate supplies as long as such gas volumes are nominated for

simultaneous receipt and further transportation and delivery by