GENERAL TERMS AND CONDITIONS

----------------------------

 

(c) If an upstream or downstream party requires

additional information, if the volumes transported are subject to a

discounted rate, or if additional information is otherwise required by

Natural, then, upon notification by Natural, Shipper must include in each

nomination such additional information as is specified by Natural.

Nominations must be submitted to Natural through Natural's Interactive

Website, or such other electronic means as are mutually agreed upon by

Natural and Shipper. The sending party should adhere to nomination,

confirmation, and scheduling deadlines. The receiving party may waive any

submittal deadline in this Section 8.

 

(d) The standard quantity for nominations, confirmation

and scheduling is dekatherms per gas day in the United States, gigajoules

per gas day in Canada and gigacalories per gas day in Mexico. (For

reference, 1 dekatherm = 1,000,000 Btus; 1 gigajoule = 1,000,000,000 joules;

and 1 gigacalorie = 1,000,000,000 calories.) For commercial purposes, the

standard conversion factor between dekatherms and gigajoules is 1.055056

gigajoules per dekatherm and between dekatherms and gigacalories is 0.251996

gigacalories per dekatherm. The standard Btu is the International Btu, which

is also called the Btu(IT); the standard joule is the joule specified in the

SI system of units. The International Btu is specified for use in the gas

measurement standards of the American Gas Association, the American

Petroleum Institute, the Gas Processors Association and the American Society

for Testing Materials. For non-commercial purposes, these associations note

that the exact conversion factor is 1.05505585262 Gigajoules per Dekatherm.

 

8.2 STANDARD NOMINATION CYCLES

 

Natural supports the following standard nomination

cycles:

 

(a) The Timely Nomination Cycle: 11:30 a.m. for

nominations leaving control of the nomination party; 11:45 a.m. for receipt

of nominations by Natural; noon to send Quick Response; 3:30 p.m. for

receipt of completed confirmations by Natural from upstream and downstream

connected parties; 4:30 p.m. for receipt of scheduled quantities by shipper

and point operator (central clock time on the day prior to flow).

 

(b) The Evening Nomination Cycle: 6:00 p.m. for

nominations leaving control of the nominating party; 6:15 p.m. for receipt

of nominations by Natural; 6:30 p.m. to send Quick Response; 9:00 p.m. for

receipt of completed confirmations by Natural from upstream and downstream

connected parties; 10:00 p.m. for Natural to provide scheduled quantities

to affected shippers and point operators, and to provide scheduled

quantities to bumped parties (notice to bumped parties), (central clock time

on the day prior to flow).