Natural Gas Pipeline Company Of America
Seventh Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 04/18/2008, Docket: RP08-319-000, Status: Effective
Original Sheet No. 315 Original Sheet No. 315 : Pending
GENERAL TERMS AND CONDITIONS
----------------------------
(d) If nominations by all Shippers under all DSS, FRSS,
FTS, FFTS and FTS-G Agreements for secondary point service for which
such Shippers are eligible exceed Natural's available capacity at any
secondary point, available capacity shall be allocated to all DSS,
FRSS, FTS, FFTS and FTS-G Shippers within their applicable MDQs at
such secondary point(s) based on MDQ.
(e) Notwithstanding the foregoing, unless a nomination
for service at a secondary point is submitted by the date nominations
are due under these General Terms and Conditions for service to
commence on the first day of a month, that nomination shall (subject
to the remainder of this subsection) be subordinate for that month,
for scheduling purposes, to timely first-of-the-month nominations for
secondary point service under Rate Schedules DSS, FRSS, FTS, FFTS or
FTS-G. Once service under a firm Rate Schedule has commenced during a
month at the secondary point, the service will not be interrupted
during that month as a result of subsequent nominations for secondary
point DSS, FRSS, FTS, FFTS or FTS-G service that would have had higher
priority if submitted as a timely first-of-the-month nomination except
as follows: (1) properly submitted and confirmed mid-month firm
service nominations at primary points will supersede any secondary
point service outside the path or where there is a constraint at the
point; and (2) properly submitted and confirmed mid-month nominations
at secondary points within a path created by primary points will
supersede secondary point service outside the path unless the capacity
constraint is only at the point. Confirmed mid-month nominations
within MDQ at a secondary point by a holder of firm service will
interrupt service at that point under any interruptible Rate Schedule.
(f) The primary Receipt and Delivery Points define the
primary path(s), including the direction of flow for the primary
path(s). Shippers may nominate service at secondary points so that
the direction of flow is the same as or the opposite from the primary
path direction of flow. However, if the primary path direction of
flow is physically a backhaul on a day, a nomination for service that
would require a physical forward haul shall be treated as being
outside the primary path on that day.
5.6 POOLING POINTS AND STORAGE POINTS
(a) (1) Service at pooling points shall be governed by
Section 9 of these General Terms and Conditions. Except where the
Automatic Agency Procedures set forth in subsection (2) below apply,
to determine the volumes which can be accommodated at a pooling