Natural Gas Pipeline Company Of America
Seventh Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 04/18/2008, Docket: RP08-319-000, Status: Effective
Original Sheet No. 310 Original Sheet No. 310 : Pending
GENERAL TERMS AND CONDITIONS
----------------------------
(2) Natural shall next schedule authorized overrun
injections and withdrawals properly requested under DSS and NSS
Agreements in excess of firm storage rights but within MDQ and MSV
[including such injections and withdrawals within MDQ and MSV under
Sections 5.3(c) of Rate Schedule DSS and 5.3(b) of Rate Schedule NSS or
as to which a waiver has been granted under Section 5.1(c) of Rate
Schedule DSS]. If Natural cannot provide all such requests, scheduling
shall be pro rata based on MDQ.
(3) Natural will next schedule all other interruptible
and authorized overrun injections and withdrawals (including injections
and withdrawals under Rate Schedules FRSS, DSS and NSS in excess of MDQ
and/or MSV), applying the scheduling priorities set out in Section 5.7.
(4) Special rules regarding the treatment of storage
points for scheduling and curtailment purposes are set out in Section
5.6 of these General Terms and Conditions.
(c) Firm intra-day nominations are entitled to bump
scheduled interruptible volumes, as defined in Section 5.7, only during
the Evening and Intra-day 1 Nomination Cycles, as defined in Section
8.2. Firm intra-day nominations are not entitled to bump already
scheduled firm volumes.
5.4 GENERAL CURTAILMENT PRIORITIES
In interrupting or curtailing service, Natural shall curtail
in accordance with the following priority sequence, with transportation
services curtailed to the extent there is insufficient transportation
capacity and storage injections and withdrawals curtailed separately to
the extent there is insufficient injection, withdrawal or storage
capacity (for the purposes of these priorities, service at Shipper's
MDQ on an Available Day under any FFTS Agreement or at the reduced
volume on a partial Available Day, shall have the same priority as Rate
Schedule FTS):