Natural Gas Pipeline Company Of America

Seventh Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 03/01/2009, Docket: RP09-309-000, Status: Effective

First Revised Sheet No. 279 First Revised Sheet No. 279

Superseding: Original Sheet No. 279

 

GENERAL TERMS AND CONDITIONS

----------------------------

 

1.18 RECOURSE RATE

 

The term "Recourse Rate" shall mean the applicable maximum

rate(s) which would apply to the service but for the rate flexibility

allowed under Section 49 hereof.

 

1.19 SHIPPER

 

The term "Shipper" shall mean a Shipper as defined in any of

the Rate Schedules governed by these General Terms and Conditions. In

addition, in a given context, Shipper may refer to an entity which is

seeking to become a Shipper. In addition, "Shipper" may refer to

Storage Expansion 2003, Sayre Storage Project, North Lansing NSS

Project, and Herscher Galesville NSS Project Shippers.

 

1.20 STANDARD REPORTING BASIS

 

Standardize the reporting basis for Btu as 14.73 psia and 60

degrees F (101.325 kPa and 15 degrees C, and dry). Standardize the

reporting basis for gigacalorie as 1.035646 Kg/cm squared and 15.6

degrees C, and dry.

 

Standardize the reporting basis for gas volumes as cubic

foot at standard conditions of 14.73 psia, 60 degrees F, and dry. For

gas volumes reported in cubic meters, the standard conditions are

101.325 kPa, 15 degrees C, and dry.

 

1.21 YEAR

 

A period of three hundred sixty-five (365) consecutive days;

provided that any such year which contains the date of February 29

shall consist of three hundred sixty-six (366) consecutive days; and

provided further that the term "year" may be established as some other

equivalent period by mutual agreement between Shipper and Natural or

between Natural and the operator of any Receipt Point or Delivery

Point, as applicable.

 

1.22 STORAGE EXPANSION 2003

 

The term "Storage Expansion 2003" shall mean the expansion

in Natural's Storage capacity resulting from the construction of

facilities authorized by the Commission pursuant to orders issued in

Docket No. CP02-391-000, 101 FERC 61,125 and 101 FERC 61,361.