Natural Gas Pipeline Company Of America

Seventh Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 04/18/2008, Docket: RP08-319-000, Status: Effective

Original Sheet No. 233 Original Sheet No. 233 : Pending

 

 

RATE SCHEDULE LPS

------------------

 

9.4 In circumstances where Shipper is unable to eliminate

its LPS RO balance because Natural is unable to accept the LPS RO

nomination, Shipper shall take any action to reduce the balance

which Natural can accommodate and Shipper shall be granted

additional time to eliminate its LPS RO balance corresponding to the

time Natural was unable to accept the LPS RO nomination. Shipper

shall not incur any penalty or daily fees as to that portion of the

balance resulting from Natural's inability to accept the LPS RO

nomination. Such extension shall only apply in instances where a

Shipper's inability to eliminate the LPS RO balance is attributable

to Natural's inability to accept and confirm LPS RO nominations.

 

9.5 Shipper remains responsible to nominate the appropriate

level of transportation to meet Natural's notification requirements

under Section 3 above, or to meet the requirements of the LPS RO.

 

10. GENERAL TERMS AND CONDITIONS

 

The provisions of the General Terms and Conditions of this

Tariff, as such provisions may be amended from time to time, are

hereby incorporated by reference and made a part of this Rate

Schedule LPS and shall apply to service rendered hereunder as though

stated herein.