Natural Gas Pipeline Company Of America
Seventh Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 04/18/2008, Docket: RP08-319-000, Status: Effective
Original Sheet No. 231 Original Sheet No. 231 : Pending
RATE SCHEDULE LPS
------------------
(maximum and minimum aggregate and daily quantities and the related
time periods) to be parked and/or loaned and returned, and the
schedule may include the flexibility to do either a park or a loan
within specified volume and time limits. The schedule may provide
for flexibility in total volumes and in the daily volumes parked
and/or loaned, in the timing of the park or the loan (or any portion
thereof), in the duration of the park and/or loan (or any potion
thereof) and/or in the timing of the completion of the park or loan
(or any portion thereof) by the return of gas to the Shipper or to
Natural, and shall specify the limits of the flexibility allowed.
Subject to the flexibility specified in the LPS RO, the MDQ RO shall be
the maximum quantity Natural is obligated, on an interruptible basis, to
receive from or deliver to Shipper under the RO on the specified day.
The MAQ RO shall be the maximum aggregate quantity Natural is obligated
to hold or loan for the account of Shipper under the RO. The minimum
aggregate and daily volumes to be parked and/or loaned and returned on
an interruptible basis shall also be specified in the LPS RO schedule.
The sum total of a Shipper's MAQ ROs and MDQ ROs shall not exceed the
MAQ and MDQ specified in the LPS Agreement. If a Shipper exceeds the
MDQ or MAQ in the LPS Agreement or fails to comply with any quantity or
timing parameter in the applicable LPS RO (unless such failure is due to
Natural not confirming a nomination properly submitted), it shall be
subject to overrun charges consistent with Section 6.1(b) of this Rate
Schedule.
8. NOMINATIONS
It shall be solely Shipper's responsibility to provide Natural
with daily nominations of the quantity of gas to be received or
delivered at the Receipt or Delivery point(s) within the parameters
specified in the applicable LPS RO. Nominations for any day or for any
nomination cycle must be consistent with the LPS RO. It shall also be
Shipper's responsibility to cause gas to be delivered to Natural and to
cause gas to be received from Natural in accordance with the LPS RO.
Nominations shall be subject to confirmation and scheduling in
accordance with the General Terms and Conditions of this Tariff. If a
nomination to reverse a park or loan is consistent with the LPS RO but
cannot be confirmed by Natural, the Shipper must continue to nominate on
subsequent days until Natural can confirm the nomination, unless the
parties agree on a revised LPS RO. Differences between confirmed
nominations and allocated volumes are subject to Balancing Service
Charges under Section 12 of the General Terms and Conditions of this
Tariff. Overrun charges apply as specified in Section 6.1(b) of this
Rate Schedule.