Natural Gas Pipeline Company Of America

Seventh Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 04/18/2008, Docket: RP08-319-000, Status: Effective

Original Sheet No. 228 Original Sheet No. 228 : Pending

 

 

RATE SCHEDULE LPS

------------------

 

The maximum and minimum rate(s) applicable to this Rate Schedule LPS

are set forth in the Currently Effective Rates section of this

Tariff. On any day, the sum of the rates for the Initial Fee, the

Park/Loan Balance Fee and the Completion Fee assessed for any park or

loan may not exceed the sum of the maximum rate for the Initial Fee

plus the maximum rate for the Park/Loan Balance Fee.

 

(2) If a Shipper has submitted a nomination to reverse

a park or loan and that nomination is consistent with the LPS RO but

is not confirmed by Natural, the Park/Loan Balance Fee shall only be

assessed on the balance which would have resulted if the nomination

had been confirmed.

 

(3) By mutual agreement between Natural and Shipper

which is consistent with the pro forma agreement set out in this

Tariff, discounts may be limited to specific volumes or time periods,

etc.

 

(b) Shipper shall pay any other applicable charges, penalties

and fees set out in this Rate Schedule LPS or the General Terms and

Conditions of this Tariff, including but not limited to ACA where

applicable. Differences between confirmed nominations and allocated

volumes will be assessed Balancing Service Charges under Section 12

of the General Terms and Conditions of this Tariff. Overrun charges

apply if Shipper exceeds the MDQ and/or MAQ in the LPS Agreement or

fails to comply with any quantity or timing parameter in an LPS RO

(unless the failure results from Natural not confirming a nomination

properly submitted). Authorized overrun charges set out on the rate

sheet apply if the overrun reflects confirmed nominations. An

unauthorized overrun charge of up to $10 per Dth applies if the

overrun is not nominated and confirmed.

 

(c) Charges payable by any Shipper shall be based on the

maximum rates set forth in this Tariff applicable to Rate Schedule

LPS, which rates are hereby incorporated herein, unless a lower rate

for the charge in subsection (a) is specified in the LPS RO.

 

(d) The charges referenced herein cover only the park or loan

service being provided under this Rate Schedule LPS. Shipper must

separately contract for any transportation service required for

Shipper to move gas to or away from the point(s) specified in the LPS

RO.