Natural Gas Pipeline Company Of America

Seventh Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 04/18/2008, Docket: RP08-319-000, Status: Effective

Original Sheet No. 221 Original Sheet No. 221 : Pending

 

 

RATE SCHEDULE LPS

------------------

 

(b) Service hereunder is subject to the priority provisions

set out in Section 3 hereof and to Mandatory Balancing under Section 9

of this Rate Schedule.

 

(c) All mutually agreeable points of receipt and delivery on

Natural's system (excluding storage points, points on non-contiguous

offshore facilities and other offsystem points) are available on a

non-discriminatory basis for service under this Rate Schedule LPS.

Unless an alternative point is agreed upon by Natural and the Shipper,

the same point must be utilized both to initiate and to complete a

specific park or loan transaction. Where Natural and a Shipper agree

to use a different point or points for completion of a specific park

or loan transaction entered into after July 31, 2001, related

transportation is required to be separate. The specific point(s) for a

park or loan shall be set forth in the applicable LPS RO.

 

(d) The Line Pack Service (Park and Loan) provided for under

this Rate Schedule LPS shall be performed under Part 284 of FERC's

Regulations. Shipper shall only tender gas under this Rate Schedule

LPS to the extent service hereunder would qualify under the applicable

statutes, regulations, FERC orders and the blanket certificate

authorizing service by Natural under this Rate Schedule LPS. For

service under Subpart B of Part 284, Shipper shall provide to Natural

appropriate certification, including sufficient information in order

for Natural to verify that the service qualifies under Subpart B of

Part 284 of the Regulations. Where required by FERC's Regulations,

Shipper shall cause the intrastate pipeline or local distribution

company on whose behalf the service will be provided to submit any

necessary certification.

 

(e) Line Pack Services (Park and Loan) available under this

Rate Schedule LPS include:

 

(1) Park Service: shall consist of Natural's receipt

of a quantity of natural gas at the designated Receipt Point(s) on

the designated date(s), requested by Shipper under a LPS RO and

approved by Natural, Natural's holding of such parked quantity of

gas for Shipper's account and Natural's redelivery of the parked

quantity of gas to Shipper at the designated Delivery Point(s) and

on the designated date(s) set forth in such LPS RO.