Natural Gas Pipeline Company Of America
Seventh Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 04/18/2008, Docket: RP08-319-000, Status: Effective
Original Sheet No. 199 Original Sheet No. 199 : Pending
RATE SCHEDULE NSS
-----------------
5.5 (a) A Shipper under this Rate Schedule NSS may
request, as part of its nomination, injections in excess of IQ or
in excess of its firm rights under Section 5.3(b) hereof or which
would cause it to exceed its MSV and may request, as part of its
nomination, withdrawals in excess of WQ or in excess of its firm
rights under Section 5.3(b). Such withdrawals and injections are
subject to Section 9 of this Rate Schedule NSS. Rights available
under Section 5.5(c) are firm and need not be nominated to the
extent of Shipper's no-notice rights hereunder in conjunction with
FTS-NB.
(b) Except as set out in subsection (c), such
injections or withdrawals shall be treated as authorized overrun
for purposes of scheduling and curtailment under the General Terms
and Conditions of this Tariff; provided, however, that injections
and withdrawals within MDQ and MSV shall be treated as higher
priority than other authorized overrun and interruptible volumes
(except corresponding authorized overrun requests under Rate
Schedule DSS, which shall be of equal priority), consistent with
the priority system set out in the General Terms and Conditions of
this Tariff; and provided further that no authorized overrun
charges apply unless MDQ and/or MSV is exceeded.
(c) Forty-eight (48) hours prior to the beginning of
each gas day, Natural shall post on the Informational Postings
portion of its Interactive Website the availability of additional
injection and withdrawal capability in excess of IQ and WQ,
determined by taking into account both daily and seasonal storage
parameters. Such availability shall be stated as percentage(s) of
IQ and WQ and shall be separately stated by pipeline leg. Upon such
posting, the storage injection and withdrawal capability stated as
available in the posting shall be firm up to MDQ for that day
provided neither Shipper's MDQ nor its MSV is exceeded (and shall
be available for no-notice rights in conjunction with FTS-NB). If
no posting is made for any day, the default volume for firm
injection and withdrawal rights on that day shall be five percent
(5%) of MDQ in excess of the otherwise applicable IQ and WQ
provided neither Shipper's MDQ nor its MSV is exceeded.
5.6 In the event Shipper segments its primary point
transportation path as a result of a capacity release under the
separate transportation Agreement(s) being used to deliver gas to
and receive gas from storage, Shipper's injection or withdrawal
rights may be affected as provided in Section 19 of the General
Terms and Conditions of this Tariff.