Natural Gas Pipeline Company Of America

Seventh Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 04/18/2008, Docket: RP08-319-000, Status: Effective

Original Sheet No. 197 Original Sheet No. 197 : Pending

 

 

RATE SCHEDULE NSS

-----------------

 

(4) Shipper's NSS Agreement shall specify the

percentage of service to which Shipper is entitled on the Amarillo

Line (Amarillo Percentage) and the percentage of service to which

Shipper is entitled on the Gulf Coast Line (Gulf Coast Percentage).

The sum of the Amarillo Percentage and the Gulf Coast Percentage

shall equal 100%. If Shipper requests separate MDQs for each

pipeline leg, the request shall at Shipper's option be treated

either as a request for separate contracts or as a request for

separate MDQs per leg within a single contract, consistent with

Section 2(d) of this Rate Schedule NSS. In either case, MDQs shall

be separately applied by pipeline leg. Because of operational

constraints on Natural's system, rights on the Amarillo Line in the

aggregate for all NSS Shippers must be approximately 25% and rights

on the Gulf Coast Line in the aggregate for all NSS Shippers must

be approximately 75%, assuming Natural has sold all the NSS service

its system is capable of providing.

 

(5) Rules regarding the allocation of injections

and withdrawals by leg are set out in Section 5.6(c) of the General

Terms and Conditions of this Tariff. In applying this subsection

(b), all receipts on Natural's system on the Amarillo Line and

north of Station 311 on the Gulf Coast Line shall be deemed to be

sourced on the Amarillo Line and injected into Amarillo Line

storage points and all other receipts shall be deemed to be sourced

on the Gulf Coast Line and injected into Gulf Coast Line storage

points, except as set out in subsection (6) below.