Natural Gas Pipeline Company Of America

Seventh Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 04/18/2008, Docket: RP08-319-000, Status: Effective

Original Sheet No. 175 Original Sheet No. 175 : Pending

 

 

RATE SCHEDULE DSS

-----------------

 

(b) Except as set out in subsection (c), such

injections or withdrawals shall be treated as authorized overrun

for purposes of scheduling and curtailment under the General Terms

and Conditions of this Tariff; provided, however, that injections

and withdrawals within MDQ and MSV [including withdrawals within

MDQ pursuant to a waiver under Section 5.1(c) or injections within

MDQ and MSV in excess of firm rights under Section 5.3(c)] shall

be treated as higher priority than all other authorized overrun or

interruptible volumes (except corresponding authorized overrun

requests under Rate Schedule NSS, which shall be of equal

priority), consistent with the priority system set out in Section

5 of the General Terms and Conditions of this Tariff; and provided

further that no authorized overrun charges apply unless MDQ and/or

MSV is exceeded.