Natural Gas Pipeline Company Of America
Seventh Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 04/18/2008, Docket: RP08-319-000, Status: Effective
Original Sheet No. 132 Original Sheet No. 132 : Pending
RATE SCHEDULE IBS
INTERRUPTIBLE BALANCING SERVICE
-------------------------------
MDQ. The MDQ under an IBS Agreement must also be consistent with the
point MDQ under the linked transportation Agreement. Subject to the
above limitations, the MDQ under the IBS Agreement shall be as
specified by Shipper in its request for service; provided, however,
that the MDQ may not exceed the higher of: (i) the highest daily
usage served by Natural at the end-use facility or facilities during
the prior twelve (12) months; or (ii) the highest daily usage which
will be served by Natural at such end-use facility or facilities
during the ensuing twelve (12) months as reasonably projected by
Shipper. The MDQ shall be redetermined at the request of either
Shipper or Natural no sooner than six (6) months after the prior MDQ
determination, or at any time by mutual agreement. In submitting
nominations under the linked transportation Agreement, Shipper must
separately identify the volumes attributed to the end-use facility or
facilities covered by the IBS Agreement.
(c) END-USE FACILITY
Shipper shall specify the end-use facility or
facilities for which imbalance management service is to be provided
under the IBS Agreement. The IBS Agreement shall cover a single end-
use facility except to the extent aggregation is permitted under
Section 7(c) of this Rate Schedule IBS. Shipper shall also specify
the Delivery Point for each such end-use facility. That Delivery
Point must also be a point of delivery (either primary or secondary)
available under the linked transportation Agreement, but may not be a
Central Delivery Point, except to the extent permitted under Section
7(c) of this Rate Schedule IBS. The location of such Delivery
Point(s) must be consistent with the location of the end-use facility
or facilities. Electronic measurement equipment must be in place and
the information must be accessible to Natural such that real time
data on deliveries to the end-use facility or facilities are
available to Natural.
(1) The request shall contain a statement either:
(i) that the service under the IBS Agreement will be used for the end-
use facility or facilities identified in the request directly connected
to Natural's system; or (ii) that service under the IBS Agreement will
be used for the end-use facility or facilities identified in the request
behind a Delivery Point or Points and the requirements of (2) are or
will be met. If not directly connected to Natural, the end-use facility
or facilities must be directly connected to facilities of the point
operator which are interconnected with Natural's system facilities.