Natural Gas Pipeline Company Of America
Seventh Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 04/18/2008, Docket: RP08-319-000, Status: Effective
Original Sheet No. 107 Original Sheet No. 107 : Pending
RATE SCHEDULE FRSS
------------------
Terms and Conditions of this Tariff. Further, such transportation
Agreement may specify that such storage point(s) are to be the Delivery
Point(s) during the Injection Period, with the applicable priority, and
that the Shipper's Delivery Point(s) are to be the primary Delivery Points
during the Withdrawal Period.
(c) By mutual agreement and on basis which is not unduly
discriminatory, Natural may accept gas tendered by Shipper for injection at
point(s) other than the Receipt Point(s) if accepting gas at such
alternative point(s) is operationally beneficial to Natural's system.
7.5 (a) A Shipper electing the storage-only option shall have both
its Receipt and Delivery Point under the FRSS Agreement at the designated
storage point as provided under Section 7.4(a)(2) of this Rate Schedule.
Such a Shipper must separately arrange for transportation of gas withdrawn
and must nominate withdrawals and deliveries unless it has firm no-notice
rights under Section 7.5(b).
(b) (1) At the time a Shipper submits its request for service
hereunder and elects the storage-only option (or at such later time as is
mutually agreed), such Shipper may request firm no-notice deliveries to a
specified point which is either a primary Delivery Point, or a secondary
Delivery Point within the primary path, under a designated separate firm
transportation Agreement. The designated firm transportation Agreement may
be a new or existing Agreement, including a capacity Release Agreement.
Shipper shall be eligible for such firm no-notice deliveries up to the
lesser of its firm withdrawal rights under the FRSS Agreement or its
available (unutilized and unnominated) firm transportation service rights
under the firm transportation Agreement(s), subject to the remainder of
this subsection. The path of the designated transportation Agreement must
be such that deliveries to the specified Delivery Point can be supported
operationally from an upstream or downstream physical storage field. On any
day, Shipper's firm no-notice rights shall be limited to withdrawals within
its rights under the FRSS Agreement, and within the unutilized and
unnominated portion of its service rights under such designated firm
transportation Agreement(s). If the designated firm transportation
Agreement is an FFTS Agreement, firm no-notice service is available only on
Available Days or partial Available Days, up to the unutilized and
unnominated portion of the MDQ in effect on that day under the FFTS
Agreement, and within Shipper's withdrawal rights under the FRSS Agreement.
(2) Shipper must designate the firm transportation
Agreement(s) to be utilized for such firm no-notice rights. Such
designation may be revised by mutual agreement of Shipper and Natural.