Natural Gas Pipeline Company Of America
Seventh Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 04/18/2008, Docket: RP08-319-000, Status: Effective
Original Sheet No. 89 Original Sheet No. 89 : Pending
RATE SCHEDULE FRSS
------------------
(b) Service hereunder shall consist of the withdrawal of gas
from storage by Natural and (unless Shipper selects the storage-only
option hereunder) the delivery of such gas to Shipper or for
Shipper's account during the Withdrawal Period at the primary
Delivery Point(s) specified in the FRSS Agreement, or at secondary
Delivery Point(s) applicable to such FRSS Agreement. If a Shipper
elects the storage-only option, the paper storage point designated
under Section 7.4(a)(2) hereof shall be both the Receipt Point and
the Delivery Point under the FRSS Agreement. Service hereunder shall
further consist of the acceptance by Natural during the Injection
Period of gas from or for the account of Shipper for injection into
storage to replace the gas withdrawn the prior Withdrawal Period.
During the Injection Period, Shipper must replace all gas withdrawn
over the prior Withdrawal Period. Fuel Gas, Gas Lost and Unaccounted
For and Storage Fuel shall be provided by Shipper as set out in
Sections 6.3(c), 6.3(d) and 7.2 of this Rate Schedule FRSS.