Natural Gas Pipeline Company Of America
Seventh Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 04/18/2008, Docket: RP08-319-000, Status: Effective
Original Sheet No. 78 Original Sheet No. 78 : Pending
RATE SCHEDULE FTS
-----------------
6.2 The charges identified in items (a)-(d) of Section 6.1
shall be assessed as follows:
(a) (1) The maximum Reservation Charge for service under
this Rate Schedule FTS shall be the applicable maximum unit
Reservation Rate(s) set out in this Tariff multiplied by Shipper's
MDQ. The Reservation Charge payable by any Shipper shall be the
maximum Reservation Charge unless a lower Reservation Charge is
specified in the FTS Agreement or a separate discount agreement or is
assessed pursuant to Section 6.8 hereof, which lower charge must be
consistent with the minimum Reservation Rate(s) specified in this
Tariff. By mutual agreement between Natural and Shipper which is
consistent with the pro forma Agreement set out in this Tariff,
discounts may be limited to specific volumes. Shipper shall be
obligated to pay the Reservation Charge hereunder beginning as of the
date FTS service commences. FTS service shall be deemed to commence
on the later of the date specified in the FTS Agreement or the date
Natural is able to render firm service hereunder to Shipper.
(2) For Shippers electing the LN option, the
applicable maximum Reservation Rate shall be increased by the LN
Surcharge as set out in this Tariff.
(3) For Shippers electing the SW option, the
applicable maximum Reservation Rate shall be determined in accordance
with the following formula:
RR = PPR + [HRR-PPR]
---------
2
where:
RR = applicable maximum Reservation Rate
PPR = the applicable maximum Reservation Rate for the weighted
average of all primary paths under the Agreement
HRR = the highest maximum Reservation Rate which could apply to
any haul on Natural's system under Natural's effective
rate matrix
If applicable, the LN Surcharge shall be added to the rate so
determined.