Natural Gas Pipeline Company Of America
Seventh Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 04/18/2008, Docket: RP08-319-000, Status: Effective
Original Sheet No. 76 Original Sheet No. 76 : Pending
RATE SCHEDULE FTS
-----------------
associated with more than one NSS Agreement or Third Party Storage
Point; provided, however, that under a predetermination allocation
agreement pursuant to Section 11 of the General Terms and Conditions
of this Tariff, a Shipper or point operator can designate a linkage
between an FTS Agreement and multiple NSS Agreements and Third Party
Storage Points so long as an administratively workable protocol for
linking the transportation and storage components is specified. The
designations hereunder may be changed on reasonable prior notice to
Natural.
(5) The NB option is available for use only in
conjunction with an NSS Agreement or comparable third party storage
agreement at a Third Party Storage Point. The NB option shall
terminate if neither of such elements is present.
(e) No-notice activity under an FTS-NB Agreement will be
posted to the storage point in the receipt zone where the imbalance
occurs or to the closest storage point where Shipper has adequate
storage rights to accommodate such activity, consistent with Section
5.6(c)(4) of the General Terms and Conditions of this Tariff.
5.4 A Shipper under Rate Schedule FTS is not obligated to
choose any of the options described in this Section 5, but may
select any one of them, any two of them or all three of them. Once
a Shipper has elected an option and so long as it remains in effect,
the Agreement for service to such Shipper may be referenced by placing
the relevant letters after FTS.
6. RATE
6.1 Shipper shall pay Natural each month for service under
this Rate Schedule FTS the sum of the following charges:
(a) a Reservation Charge based on Shipper's MDQ;
(b) a Commodity Charge for each unit of gas delivered
hereunder by Natural during the billing month;
(c) Gathering and Offshore Charge(s);
(d) all applicable types of transition cost charges; and
(e) any other applicable charges and penalties set out in
this Rate Schedule FTS or the General Terms and Conditions of
this Tariff.