Williston Basin Interstate Pipeline Co.
Second Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 02/16/2009, Docket: RP09-223-000, Status: Effective
Fifteenth Revised Sheet No. 376 Fifteenth Revised Sheet No. 376
Superseding: Fourteenth Revised Sheet No. 376
GENERAL TERMS AND CONDITIONS (Continued)
48. POOLING SERVICE (Continued)
48.2.1.10 Powder River Pool (Point ID No. 06090) -
contains the associated receipt points on Line Sections 13
and 14.
48.2.1.11 WBI Storage Pool (Point ID No. 06100) -
contains the associated receipt points for WBI Aggregate
Storage.
48.2.1.12 Grasslands Pool (Point ID No. 06110) -
contains the associated receipt points on Line Section 26.
48.2.2 The pool boundaries are reflected on Transporter's
system maps provided on Sheet Nos. 5-11 of this Tariff. Proposed
changes to the pool boundaries will be submitted to the FERC at
least 30 days prior to such changes being implemented.
48.2.3 The associated receipt points, as listed on the Pooling
Point link provided via Transporter's Interactive Website, will be
updated as needed to reflect the addition of a new receipt
point(s) and/or the abandonment of an existing receipt point(s)
within the pool boundaries.
(The rest of this sheet has been intentionally left blank.)