Williston Basin Interstate Pipeline Co.

Second Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 05/11/2009, Docket: RP09-506-000, Status: Effective

Fourth Revised Sheet No. 369 Fourth Revised Sheet No. 369

Superseding: Third Revised Sheet No. 369

 

GENERAL TERMS AND CONDITIONS (Continued)

 

46. LATERAL PIPELINE POLICY (Continued)

 

46.1.2 Transporter has or obtains any certificate

authorizations necessary to build, acquire and/or install the

service lateral pipeline(s), tap(s) and/or metering facilities;

and

 

46.1.3 Shipper(s) or Point Operator, as applicable, agree in

writing to reimburse or compensate Transporter for 100% of

Transporter's construction, acquisition and/or installation costs

(including any associated tax effects) through one or a

combination of the following payment methods:

 

46.1.3.1 Payment of an up-front contribution in aid of

construction prior to the commencement of construction,

acquisition and/or installation; and/or

 

46.1.3.2 Payment of a separately stated reservation

charge for the new facilities under a firm transportation

contract for the use of these facilities; and/or

 

46.1.3.3 Payment of reservation charges for a new and/or

incremental quantity of mainline firm transportation

service; and/or

 

46.1.3.4 Payment through any mutually agreeable method.

 

46.2 Shippers choosing payment methods described in Subsections

46.1.3.2 and/or 46.1.3.3 shall be required to enter into new or

incremental firm transportation contracts for sufficient entitlement and

duration to produce an incremental net revenue stream providing a

present value equal to or greater than Transporter's construction,

acquisition, and/or installation costs (including any associated tax

effects). Shipper shall be required to demonstrate creditworthiness as

specified in Subsection 7.7 of this Tariff, to support said firm

transportation contracts.

 

46.3 For the purposes of this Section 46, Transporter's construction,

acquisition, and/or installation costs shall include, but shall not be

limited to: Transporter's design costs, equipment costs, labor costs,

material costs,