Williston Basin Interstate Pipeline Co.
Second Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 02/01/2000, Docket: RP00-165-000, Status: Effective
Original Sheet No. 358E Original Sheet No. 358E : Effective
GENERAL TERMS AND CONDITIONS (Continued)
39. TRANSITION COST RECOVERY MECHANISMS (Continued)
divided by the number of years remaining in the Total
Recovery Period, plus applicable interest. In the
event that Transporter's actual interruptible
transportation throughput billed the GSR unit rate
under Rate Schedule IT-1 is less than the effective
total interruptible transportation throughput
underlying the GSR unit rate, Transporter shall debit
an amount to each of the subsequent annual principal
amounts equal to the difference in throughput
multiplied by the principal portion of the currently
effective GSR unit rate, divided by the number of years
remaining in the Total Recovery Period, plus applicable
interest.
Transporter shall tender, as part of an "Annual
Reconciliation" filing, the GSR unit rate to be
assessed commencing the next July 1, reflecting such
recalculations, plus related interest calculated in
accordance with Section 154.501 of the FERC's
Regulations. The adjusted GSR unit rate resulting from
the Annual Reconciliation filing shall be effective on
July 1 following the filing of the Annual
Reconciliation. Such GSR unit rate(s) shall be
determined by dividing the next annual principal
amount, as adjusted, plus any adjustment to interest
for the prior period(s), plus applicable future
interest, by the effective total interruptible
transportation throughput applicable to the next annual
period.
Once a recovery period has been trued-up in an annual
reconciliation filing to include actual throughput, the
GSR unit rate for that same recovery period shall not
be subject to revision for a change in effective total
interruptible transportation throughput.
Transporter shall bill the GSR unit rate applicable to
each Total Recovery Period through the end of that
Total Recovery Period, and thereafter refund any
overcollections or bill for any undercollections of the
GSR unit rate with interest calculated in accordance
with Section 154.501 of the FERC's Regulations. Each