Williston Basin Interstate Pipeline Co.

Second Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 11/01/1993, Docket: RS92- 13-011, Status: Effective

2nd Substitute Original Sheet No. 354 2nd Substitute Original Sheet No. 354 : Effective

 

GENERAL TERMS AND CONDITIONS (Continued)

 

39. TRANSITION COST RECOVERY MECHANISMS (Continued)

 

from Applicable Interruptible Shippers during

such portion of the recovery period that such

GSR Costs had not been expended by

Transporter. Additionally, Transporter shall

calculate revisions to the base rate GSR unit

cost to true-up differences between the actual

level of interruptible transportation

throughput billed the base rate GSR unit cost

under Rate Schedule IT-1 during the recovery

period ending the preceding March 31 and the

effective total interruptible transportation

throughput underlying the base rate GSR unit

cost actually billed during that same recovery

period. More specifically, in the event that

Transporter's actual interruptible

transportation throughput billed the base rate

GSR unit cost under Rate Schedule IT-1 is

greater than the total effective interruptible

transportation throughput underlying the GSR

unit cost, Transporter shall credit an amount

to each of the subsequent annual principal

amounts equal to the difference in throughput

multiplied by the principal portion of the

currently effective base rate GSR unit cost,

divided by the number of years remaining in

the Total Recovery Period, plus applicable

interest. In the event that Transporter's

actual interruptible transportation throughput

billed the base rate GSR unit cost under Rate

Schedule IT-1 is less than the effective total

interruptible transportation throughput

underlying the GSR unit cost, Transporter

shall debit an amount to each of the

subsequent annual principal amounts equal to

the difference in throughput multiplied by the

principal portion of the currently effective

base rate GSR unit cost, divided by the number

of years remaining in the Total Recovery

Period, plus applicable interest.

 

Transporter shall tender, as part of an

"Annual Reconciliation" filing, the base rate