Williston Basin Interstate Pipeline Co.

Second Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 02/01/1997, Docket: RP97-215-002, Status: Effective

First Revised Sheet No. 337A First Revised Sheet No. 337A : Effective

Superseding: Original Sheet No. 337A

GENERAL TERMS AND CONDITIONS (Continued)

 

38. FUEL REIMBURSEMENT ADJUSTMENT PROVISION (Continued)

 

Electric Power Fuel Reimbursement

Surcharge Percentage-Storage, as

applicable, included in

Transporter's rates for each

month by the applicable contract

storage injections and

withdrawals for that month under

the applicable Rate Schedules

contained in Transporter's FERC

Gas Tariff, Second Revised Volume

No. 1 and Original Volume No. 2.

The account shall be increased in

the event the surcharge is a

negative amount. For purposes of

reducing or increasing the

electric power storage amortizing

subaccount, as appropriate, for

Storage Electric Power reimbursed

in-kind, such in-kind quantities

shall be valued at Transporter's

actual system average cost of gas

during the month.

 

38.8 Unrecovered Fuel Reimbursement Account-Transportation:

 

38.8.1 Transporter shall establish and maintain a

transportation current deferral subaccount of the

Unrecovered Fuel Reimbursement Account-Transportation.

The accumulated transportation current deferral

subaccount balances of Account No. 182.3 may include

the following:

 

38.8.1.1 The monthly deferral of Transporter's under-

or over-recovered actual transportation fuel

reimbursement costs.

 

38.8.1.2 The monthly deferral of Transporter's under-

or over-recovered actual transportation in-

kind fuel reimbursement.

 

38.8.1.3 Adjustments to prior months' revenue due to a

revision in a prior month's level

transportation receipts.