Williston Basin Interstate Pipeline Co.
Second Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 02/01/1997, Docket: RP97-215-002, Status: Effective
First Revised Sheet No. 337A First Revised Sheet No. 337A : Effective
Superseding: Original Sheet No. 337A
GENERAL TERMS AND CONDITIONS (Continued)
38. FUEL REIMBURSEMENT ADJUSTMENT PROVISION (Continued)
Electric Power Fuel Reimbursement
Surcharge Percentage-Storage, as
applicable, included in
Transporter's rates for each
month by the applicable contract
storage injections and
withdrawals for that month under
the applicable Rate Schedules
contained in Transporter's FERC
Gas Tariff, Second Revised Volume
No. 1 and Original Volume No. 2.
The account shall be increased in
the event the surcharge is a
negative amount. For purposes of
reducing or increasing the
electric power storage amortizing
subaccount, as appropriate, for
Storage Electric Power reimbursed
in-kind, such in-kind quantities
shall be valued at Transporter's
actual system average cost of gas
during the month.
38.8 Unrecovered Fuel Reimbursement Account-Transportation:
38.8.1 Transporter shall establish and maintain a
transportation current deferral subaccount of the
Unrecovered Fuel Reimbursement Account-Transportation.
The accumulated transportation current deferral
subaccount balances of Account No. 182.3 may include
the following:
38.8.1.1 The monthly deferral of Transporter's under-
or over-recovered actual transportation fuel
reimbursement costs.
38.8.1.2 The monthly deferral of Transporter's under-
or over-recovered actual transportation in-
kind fuel reimbursement.
38.8.1.3 Adjustments to prior months' revenue due to a
revision in a prior month's level
transportation receipts.