Williston Basin Interstate Pipeline Co.
Second Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 02/01/1997, Docket: RP97-215-002, Status: Effective
Second Revised Sheet No. 335 Second Revised Sheet No. 335 : Effective
Superseding: First Revised Sheet No. 335
GENERAL TERMS AND CONDITIONS (Continued)
38. FUEL REIMBURSEMENT ADJUSTMENT PROVISION (Continued)
For gas reimbursed in-kind will
be valued at Transporter's actual
system average cost of gas during
the month.
38.7.2.2.2 The Cost of Electric Power
Purchased For Contract Storage
Operations recovered in-dollars
and in-kind shall be determined
by multiplying the projected
Current Fuel Reimbursement
Electric Power Charge-Storage or
Current Fuel Reimbursement
Electric Power Percentage-Storage
as described in Subsections
38.3.3.2 and 38.4.3.2 hereof,
respectively, in effect during
the deferral month, as
applicable, by the appropriate
actual contract storage
injections and withdrawals under
each applicable Rate Schedule
during the month. The quantities
of Storage Electric Power
reimbursed in-kind will be valued
at Transporter's actual system
average cost of gas during the
month.
38.7.2.3 Transporter shall determine the monthly
storage deferral cost amounts as follows:
38.7.2.3.1 The monthly storage deferral cost
of gas amount shall be determined
by taking the difference between
the gas-related dollar amounts
derived in Subsections 38.7.2.1.1
and 38.7.2.2.1 herein, and the
resulting amounts shall be
reflected in Transporter's gas
storage current deferral
subaccount.