Williston Basin Interstate Pipeline Co.
Second Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 02/01/1997, Docket: RP97-215-002, Status: Effective
Second Revised Sheet No. 334 Second Revised Sheet No. 334 : Effective
Superseding: First Revised Sheet No. 334
GENERAL TERMS AND CONDITIONS (Continued)
38. FUEL REIMBURSEMENT ADJUSTMENT PROVISION (Continued)
along with the related interest paid, as
described in Subsection 38.7.4 hereof.
38.7.1.6 Carrying charges on the storage current
deferral and amortizing subaccounts as
specified in Subsection 38.7.3 hereof.
38.7.2 The amount to be included in the storage current
deferral subaccounts in order to reflect the items
specified in Subsections 38.7.1.1, 38.7.1.2 and
38.7.1.3 hereof shall be calculated as follows:
38.7.2.1 Transporter shall first determine:
38.7.2.1.1 The allocation of actual monthly
Storage Company Use and Lost and
Unaccounted For gas quantities to
contract storage injections and
withdrawals based on the ratio of
the sum of actual contract
storage injections and
withdrawals to the total of the
actual system storage injections
and withdrawals and actual
contract storage injections and
withdrawals. The quantities of
Storage Company Use and Lost and
Unaccounted For gas so allocated
to contract storage service shall
then be valued at Transporter's
actual system average cost of gas
during the month.
38.7.2.1.2 The allocation of actual monthly
Storage Electric Power Cost to
contract storage injections and
withdrawals based on the ratio of
the sum of actual contract
storage injections and
withdrawals to the total of the
actual system storage injections
and withdrawals and actual
contract storage injections and
withdrawals.